Więcej pomysłów od użytkownika Katarzyna
Lift lobby - dark ceiling and hanging light

Lift lobby - dark ceiling and hanging light

A Strikingly Minimal Home Built in Less Than Six Months | Dwell

A Strikingly Minimal Home Built in Less Than Six Months | Dwell

Éclairage général | Luminaires muraux à encastrer | XG2035. Check it out on Architonic

Éclairage général | Luminaires muraux à encastrer | XG2035. Check it out on Architonic

escalier beton ©photo: vincent duterne ©architecture: www.bldw.be

escalier beton ©photo: vincent duterne ©architecture: www.bldw.be

Nukav by Modular Lighting Instruments

Nukav by Modular Lighting Instruments

06 hotel-risveglio_corridor

06 hotel-risveglio_corridor

Lift floor level in matte painted acrylic.

Lift floor level in matte painted acrylic.

client: Bumi Parama Wisesa (Sinarmas Land & Hongkong Land)  |  project: Marigold Residential  |  BSD, Tangerang, Indonesia, 2016

client: Bumi Parama Wisesa (Sinarmas Land & Hongkong Land) | project: Marigold Residential | BSD, Tangerang, Indonesia, 2016

Interior of the Bao’an Stadium in Shenzen by Gmp Architekten (photo by Christian Gahl) _

Interior of the Bao’an Stadium in Shenzen by Gmp Architekten (photo by Christian Gahl) _

Photo 2: timber cladding in this lift area looks lovely and modern and protects/ conceals dings and marks on the walls:

Photo 2: timber cladding in this lift area looks lovely and modern and protects/ conceals dings and marks on the walls: